Friday, December 18, 2009

M&E COORDINATION DRAWING FOR APARTMENT UNIT, SWIMMING POOL ( L12 ) AND SWIMMING POOL PUMP ROOM ( L11 )

SOLARIS DUTAMAS - SWIMMING POOL ( L12 )



BELOW IS THE M&E COORDINATION DRAWING FOR APARTMENT UNIT ( ACMV CHILLED WATER, ACMV FAN COIL UNIT, PLUMBING ( HOT & COLD WATER AND SANITARY ) AND NATURAL GAS PIPING AND SWIMMING POOL PUMP ROOM ( L11 ) WHICH IS DONE BY ME



Thursday, December 17, 2009

M&E COORDINATION WORKS - GYMNASIUM SOLARIS

This drawing of Coordination and Readjustment M&E services and Reflected Ceiling Plan . 40% original architect design changed due to the site condition and this drawings are approved by Architect and Consultant M&E Engineer then.







* Actual site installation for ACMV and Sprinkler piping ( as per approved M&E Coordination drawing which is done by me )

M&E COORDINATION WORKS ( DEWAN SERBAGUNA )

Coordination between Supply Air Duct, District Cooling System CHW piping and Sprinkler piping ( using AutoCad application )



Done by me


Done by me








**Actual site installations

M&E COORDINATION WORKS

Coordination between M&E services and ceiling access opening at plaster ceiling area to prevent clashing each other ( using AutoCad application )




PREVIOUS EMPLOYER - Bina Goodyear Bhd

Position : M&E Administrator
Specialization : Engineering / Mechanical / Architecture
Date Joined : 6.10.08
Date Left : Present
Scope of Work :
1 ) Site Works :- Site Pipe Sleeve Setting Out, Site Coordination / Carry out Inspections with sub-contractor ( Pipe sleeves, conceal conduit, pressure test, physical inspection, Monitoring sub-contractor Daily / Weekly Progress Report ( for all blocks ).

2 ) Drawings :- Do M&E Coordination drawings c/w sectional drawings, Ceiling Ceiling access opening coordination drawings, RCP for M&E services for Engineer / Architect approval.( for all blocks ).

3 ) Documentation :- Issue outgoing memo to sub-contractor, Request For Information to Engineer / Architect ( for all blocks ).







SOLARIS DUTAMAS, JALAN DUTA - Cadangan Pembangunan Perdagangan Yang Mengandungi : 6 Blok 24 Tingkat Bangunan Bercampur Kedai/Pejabat dan Servis Apartment ( 244 Unit Setiap Blok) – Block C ( North & South ), D ( North & South ) dan E ( North & South ), Kolam renang, Dewan Serbaguna dan Gymnasium


Employment History - Globe Engineering Sdn Bhd

Position : Assistant Project Manager
Level : Executive
Specialization : Engineering / Mechanical
Date Joined : September 2006
Date Left : September 2008
Scope of Work : 1 ) Site Works :- Site Pipe Sleeve Setting Out, Site Coordination / Carry out Inspections with sub-contractor
( Pipe sleeves, conceal conduit, pressure test, physical inspection, Monitoring sub-contractor Daily / Weekly Progress Report.
2 ) Drawings :- Provision of M&E Coordination drawings c/w sectional drawings, As Built Drawing, Ceiling Ceiling access opening coordination drawings, RCP for M&E services for Engineer / Architect approval
3 ) Documentation : - Issue outgoing memo to sub-contractor, Request For Information to Engineer / Architect



MENARA PERAK, JALAN PERAK

26 Storeys Office Building at Jalan Pinang, Kuala Lumpur for Messr. Malaysian Landed.
Main Contractor : WTW Bovis Lend Lease
Scope Of Works : Plumbing ( Cold Water & Sanitary ),External Water Recticulation, Fire Fighting ( Sprinkler, Wet Riser, Hose Reel, Hydrant ), Fire Alarm ( Smoke Detector, Firemen Intercom, Pyrogen, CO2 )
Reference : Mr Markandan Sanasi ( BOVIS M&E Coordinator) 012-652 9020

Wednesday, December 16, 2009

Employment History - KNH Engineering & Constructions Sdn Bhd

Position : Project Coordinator
Specialization : Engineering / Mechanical
Date Joined : 15.09.05
Date Left : 30.09.07
Scope of Work : A )Pipe Sleeve Setting Out, Site Coordination ( Hot & Cold pipes routing &
Sanitary Wares, Sewerage Line ),
B ) Inspections , Daily / Weekly Progress Report & Workers management.


105 units of Super Structure Condominium, Park 7 KLCC
Main Contractor : IJM Constructions S/B
Scope Of Work : Installation of Hot & Cold Water piping, installation of sanitary
Wares and UPVC pipes for Soil Waste Stack & Vent Pipes.


958 Units Apartment Parcel 12, Precint 9, Putrajaya
Main Contractor : SP Setia
Scope Of Work : Installation of Cold Water piping, installation of sanitary wares,
installation of V.C.P pipes and manhole ( Infra ) for
Manhole / Sewerage and UPVC pipes for Soil Waste Stack & Vent Pipe.

606 Units Apartment Parcel 7, Precint 9, Putrajaya
Main Contractor : SP Setia
Scope Of Work : Installation of Cold Water piping, installation of sanitary wares,
installation of V.C.P pipes and manhole ( Infra ) for
Manhole / Sewerage and UPVC pipes for Soil Waste Stack & Vent Pipe.





Alam Warisan Hotel, Precint 6, Putrajaya
Main Contractor: IJM Constructions S/B
Scope Of Work : Installation of Hot & Cold Water piping, installation sanitary
wares , installation of V.C.P pipes and manhole ( Infra ) for
Manhole / Sewerage and UPVC pipes for Soil Waste Stack & Vent Pipe.

Tuesday, December 15, 2009

EMPLOYMENT HISTORY - METRONIC GLOBAL BHD ( formerly known as Metronic Engineering Sdn Bhd )

















Lot 4G1 & 4G2, Putrajaya. ( WCT )
Services : BCS ( Building Control System )
Project Manager : Muazzam ( 03-7847 2111 )

















Lot 2G3 & 2G4 ( near M.O.F ), Putrajaya. ( WCT )
Services : BCS ( Building Control System )
Project Manager : Muazzam ( 03-7847 2111 )
















Dec' 02-Feb '03 : Ampang Hospital ( AZSB )
Services : BCS ( Building Control System )
Project Manager : Mr. Mohd Faiz Bin Saad

SIRIM SEPANG

Services : Building Automation System ( BAS,BSS & BCS ), CAMS ( Card Access ManagementSystem ) and CCTV.Scope of Works : Daily/ weekly/ monthly report, Inspection,Progress Meeting, Safety Patrol, Site Supervisory/Management, GeneralWorkers Management.

EMPLOYMENT HISTORY - NELTON ENGINEERING

Position : Project Supervisor
Scope of Works : Fire Fighting & Fire Alarm
Specialization : Engineering – Mechanical
Date Joined : Jun 2000
Date Left : Jun 2002








Jan2001-Jun 2002 : KL Sentral Hotel ( Hilton & Meridien )
Services : Fire fighting/ Fire Alarm
Main Contractor : Takenaka Corporation
Reference : Mr. C.K Lee ( Nelton’s Project Manager )

Jun 2000-Dec 2001 : Menara Great Eastern Project
Services : Fire fighting/ Fire Alarm
Main Contractor : Obayashi Corporation.
Reference : Mr. C.K Lee ( Nelton’s Project Manager )